ISR is providing numerous design support and configuration of CCTV, Access Control Systems and their WAN/LAN Networks for the Second Avenue Subway Phase I Systems Integration project?

 

 
 
 
 
 
 
 
 
 
 

 

   
 
     
  MTACC 2ND AVENUE SUBWAY PHASE I SYSTEMS INTEGRATION
• Systems Design
• Contract Compliance/Submittals (RTM)
• Design Development Criteria (PDR, FDR & FAT)
• Factory Acceptance Testing & Lab Development
• Design Support & Configuration of CCTV & Access Control Systems & their WAN/LAN Networks
• Equipment Procurement and Laboratory Design/Set-Up to Support Local FAT Testing
• Systems Integration
• Installation Oversight & Verification
• Field Acceptance Testing
• Development of Test Procedures
• Development of Preliminary Training Program



  MTACC INTEGRATED ELECTRONIC SECURITY SYSTEM & C3
• First Major C3 Site Brought On Line
• Systems Integration
• CCTV
• Security Access Control
• WAN/LAN Networks
• Testing & Inspection
• Testing & Inspection Documentation


 
  MTACC EAST SIDE ACCESS PROJECT CM - SYSTEMS
• Systems Integration Management
• CM of Installation, Testing & Commissioning
• Communications Control Systems
• Fire Life Safety / Building Management Systems
• Systems Software for Security
• CCTV
• Data Capture & Reporting
• Fiber Optic Backbone
• LAN & Network Architecture
• Requirements Traceability Matrix